Select Language : English 日本語 中文(繁體字) 中文(简体字)

Americas

Brazil: English / 日本語 / Português do Brasil
United States: English

Europe, Middle East, Africa (EMEA)

EMEA:
(Belgium, France, Germany, Netherlands, Spain, United Arab Emirates, United Kingdom)
English / 日本語 / Español / Deutsch / Français
Russia: English / 日本語 / русский

Asia Pacific

Japan(Business): English / 日本語
Japan(Residential): English / 日本語
Australia(NTT Com ICT Solutions): English
Mainland China: English / 日本語 / 簡體中文
Hong Kong & Macao: English / 日本語 / 繁体中文 / 簡體中文
India: English / 日本語
Indonesia: English
Korea: English / 日本語 / 한국어
Malaysia: English
Philippines(DTSI): English
Singapore: English / 日本語
Taiwan: English / 日本語 / 繁体中文
Thailand: English / 日本語
Vietnam: English / 日本語
cmn_ic_service-kobetsu_data-center

Data Center

Japan

 

Tokyo No.4
Tokyo No.5
Tokyo No.6
Tokyo No.9
Yokohama No.1
Osaka 5
Takamatsu No.2

Tokyo No.4 Data Center

 

Tokyo No.4 Data Center

 

Location

  • Tokyo, Japan
  • 70-minute drive from Narita International Airport
  • 8-minute walk from the nearest train station


Features and Benefits

 

Convinient Location

Only 15 minutes away from Tokyo station and an 8 minute walk from the nearest train station. You can also walk to the data center on foot from Tokyo Metropolitan Bisiness District even if public transportation stops in cases of emergency. 

 

Seismic Isolation

The structure of Japan Tokyo No. 4 Data Center is seismically isolated and can reduce 80% of seismic shocks during an earthquake. Isolation can keep the impact of an earthquake to the minimum, protecting the building, facilities and equipment, even in the case of an earthquake as big as the Great Eastern Japan Earthquake in 2011. Major facilities for power and air-conditioning are configured for redundancy to ensure high reliability.

 

Carrier Neutral

The Data Center is a carrier neutral data center providing a variety of network services by different carriers. This gives you the flexibility to construct a network environment with network service provider redundancy to improve business continuity planning (BCP).

Specification

Power

  • Dual path
  • UPS in N+1 configuration
  • Gas turbine generator in N+1 configuration
  • Dual power feed to each rack
  • Power supply: Up to 6 kVA/rack

 

Air-conditioning

  • Water-cooling system
  • N+1 redundant configuration

 

Security

  • Pre-registration
  • Photo identification
  • IC card authentication
  • Biometric authentication
  • Anti-tailgating system

Certification

  • ISO 9001
  • ISO 14000
  • ISO 20000
  • ISO 27001
  • ISO 22301
  • Privacy Mark (JIS Q 15001)
  • COPC-2000

 

Other facilities

  • Meeting room
  • parking space
  • office space for customers

 

Related Link

Tokyo No.5 Data Center

 

Tokyo No.5 Data Center

 

Location

  • Tokyo, Japan
  • 1 hour drive from Narita International Airport
  • 2-minute walk from the nearest train station


Features and Benefits

 

Purpose-build Data Center

Tokyo No.5 Data Center is one of the largest self-designed, purpose-built data centers in Tokyo.

 

Great Access

The Data Center is located within 2.5 km from Otemachi (central Tokyo) area.

 

Seismic Isolation

Seismically isolated structure ables to withstand earthquakes of intensity as much as the Great Eastern Japan Earthquake in 2011. This was proven during the earthquake occured and the movement of the Data Center building was only 43 mm radius.

 

Specification

Power

  • Dual path
  • UPS in  N+1 or 2(N+1) configuration
  • Gas turbine generator in N+1 configuration
  • Dual power feed to each rack
  • Power supply: Up to 4 kVA/rack

Air-conditioning

  • Air-cooling system
  • N+1 configuration

Security

  • Pre-registration
  • Photo identification
  • IC card authentication
  • Biometric authentication
  • Anti-tailgating system

Certification

  • ISO 9001
  • ISO 14000
  • ISO 20000
  • ISO 27001
  • ISO 22301
  • Privacy mark (JIS Q 15001)
  • COPC-2000 certified

Other facilities

  • Meeting room
  • Office space for customers
 
 
 

 

Related Link

Tokyo No.6 Data Center

 

Tokyo No.6 Data Center

 

Location

  • Tokyo, Japan
  • 1 hour drive from Narita International Airport
  • 7-minute walk from the nearest JR line station


Features and Benefits

 

Largest in Tokyo

Only a 7-minute walk from the nearest train station and accessible from multiple train stations, diverse access routes are available even in case of emergency. The Tokyo No. 6 Data Center is built on stable hard ground and is 10 km from Tokyo Bay, and 1.5 km from the closest river. Tokyo No. 6 also has a large-scale, fully-equipped office building on-site for use during systems monitoring, maintenance and business continuity planning (BCP) operations. 

 

Seismically Isolated

The Data Center can reduce seismic shocks to one-fifth their force, preventing adverse affects on your equipment and on our facilities and buildings. Furthermore, all major equipment has redundant configurations. The communications path is connected directly to a secure earthquake-proof cable tunnel.

 

PUE 1.2

It has achieved the highest level of power usage effectiveness (PUE) of all data centers in Japan. This has been achieved by adopting water-cooled air conditioning with outdoor air cooling system, rotary UPS, which minimizes power loss, and advanced air flow management system.

 

50% Cost Saving

With its superior efficiency and space-saving structure enable cost reduction of up to 30 percent per rack. Structural efficiencies enable 50 percent more devices per rack compared to similar data center facilities. This can reduce your operating costs by as much as 50 percent compared to other data centers.

Specification

Power

  • Dual Path
  • UPS in N+1 or 2(N+1) configuration
  • Rotary UPS
  • Dual power feed to each rack
  • Power supply: Up to 6kVA/rack

Air-conditioning

  • Water cooling system
  • N+1 configuration

Security

  • Pre-registration
  • Photo identification
  • IC card authentication
  • Biometric authentication
  • Anti-tailgating system

 

Certification

  • ISO 9001
  • ISO 27001
  • ISO 20000
  • ISO 22301
  • ISO 14000
  • Privacy mark (JIS Q 15001)
  • COPC-2000 certified

Other facilities

  • Meeting room
  • Parking space
  • Office space for customers

 

Related Link

Tokyo No.9 Data Center

 

Tokyo No.9 Data Center

 

Location

  • Tokyo, Japan
  • 40-minute drive from Tokyo International Airport
  • 15-minute walk from the nearest JR line station


Features and Benefits

 

Great Access

Tokyo No.9 Data Center is located in the Tokyo metropolitan area and it has multiple accessibility of public transportations.

 

BCP office

This Data Center has fully equipped office building for use as a system monitoring center or a buisiness countinuity planning (BCP) office. 

 

Business Ready

There are variety of amenities to satisfy customer comfort such as cafeteria, fitness gym, customer lounge, shower room, and more.

Specification

Power

  • Dual Path
  • UPS in N+1 configuration
  • Gas turbine engine
  • Dual power feed to each rack

Air-conditioning

  • Water cooling system

Security

  • Pre-registration
  • Photo identification
  • IC card authentication
  • Biometric authentication
  • Anti-tailgating system

Other facilities

  • Meeting room
  • Parking space
  • Office space for customers

 

Related Link

Yokohama No.1 Data Center

 

Yokohama No.1 Data Center

 

Location

  • Yokohama, Kanagawa, Japan
  • 50-minute drive from Tokyo International Airport (Haneda Airport)
  • 15-minute walk from the nearest train station


Features and Benefits

 

DR Site

It's perfect for a business countinuity planning. Ideal location of disaster recovery including floods and earthquake.

Business Ready

Yokohama No.1 Data Center is a high-performance data center perfect for business continuity planning (BCP).

 

High Quality

This Data Center has full control over facility design and operations ensures high quality service and flexibility for customization.

Specification

Power

  • Loop path
  • UPS in N+1 or 2(N+1) configuration
  • Gas turbine generator in N+1 configuration
  • Dual power feed to each rack
  • Power supply: Up to 6 kVA/rack

Air-conditioning

  • Air-cooling system
  • N+1 configuration

Security

  • Pre-registration
  • Photo identification
  • IC card authentication
  • Biometric authentication
  • Anti-tailgating system

Certification

  • ISO 9001
  • ISO 14000
  • ISO 20000
  • ISO 27001
  • ISO 22301
  • Japanese SAS70
  • BS7799 

Other facilities

  • Meeting room
  • Parking space
  • Office space for customers

 

Osaka 5 Data Center

 

Osaka 5 Data Center

 

Location

  • Osaka, Japan
  • 1 hour drive from Kansai International Airport
  • 7-minute walk from the nearest train station


Features and Benefits

 

Great Access

Osaka 5 Data Center stands only 7 minutes away from the nearest train station and is accessible within 20 minutes from the JR Shin-Osaka station. You can reach the data center on foot from metropolitan bisiness district in Osaka, even when all the public transportation halts in an emergency. The data center is located 6 km away from Osaka Bay and 3 km away from the closest river.

 

Seismic Isolation

With its seismic isolation structure, the Data Center can reduce 80 percent of seismic shocks from an earthquake. This minimizes the impact of an earthquake and protects the building, facilities and computer equipment, even in an earthquake as big as the Great Eastern Japan Earthquake in 2011 or Great Hanshin Earthquake in 1995. The data center has a direct connection to a robust seismic cable tunnel that protects lead-in cables from damage by earthquakes, providing highly reliable and secure network connectivity.

 

PUE 1.3

It has achieved PUE 1.3 by adopting a variety of ecological initiatives, including installation of energy efficient water-cooling system, outdoor air-cooling system and cooling wall system.

 

Cable Tunnel

Communications routes are laid from four directions, include connected directly to secure earthquake-proof cable tunnel, with no damage from past major earthquakes.

Specification

Power

  • Dual path
  • UPS in N+1 configuration
  • Gas turbine generator in N+1 configuration
  • Dual power feed to each rack
  • Power supply: Up to 15 kW/rack

Air-conditioning

  • Water-cooling system
  • N+1 redundant configuration

Security

  • Pre-registration
  • Photo identification
  • IC card authentication
  • Biometric authentication
  • Anti-tailgating system

Certification

  • ISO 9001
  • ISO 20000
  • ISO 27001
  • PCI DSS

Other facilities

  • Meeting room
  • Office space for customers

 

Related Link

Takamatsu No.2 Data Center

 

Takamatsu No.2 Data Center

 

Location

  • Kagawa, Japan
  • 30-minute drive from Takamatsu Airport
  • 30-minute drive from JR Takamatsu station


Features and Benefits

 

Purpose-built Data Center

Takamatsu No.2 Data Center is purpose-built, self-designed large-scale data center.

 

DR Site

It is loacted in low risk area of natural disaster such as flood and earthquake. The Data Center is seismically isolated structure able to withstand earthquakes of intensity level 7.

 

High-quality

Data center floor is capable of high-density installation of the latest ICT equipment including world-class green performance with solar power systems and external cooling systems.

Specification

Power

  • Dual path
  • UPS in N+2 configuration
  • Gas turbine generator in N+1 configuration
  • Dual power feed to each rack
  • Power supply: Up to 21 kVA/rack

Air-conditioning

  • Air-cooling and water-cooling system
  • N+2 redundant configuration

Security

  • IC card authentication
  • Metal detector
  • Anti-tailgating system

Certification

  • ISO 27001 (ISMS) 
  • ISO 20000 certified

Other facilities

  • Meeting room
  • Parking space

 

Related Link

Related Resources

Back to Top